True Roofing SA
0421 568 663trueroofingsa@gmail.com
Roof Replacement by True Roofing SA
— Full replacement / Murray Bridge & Murraylands

Roof replacement,
start to finish.

When patching stops making sense, we take the whole roof back to the frame and rebuild it properly: timber checked and repaired, new sarking, new Colorbond® sheets, flashings, gutters and downpipes. One crew, one written quote, one warranty covering the lot.

Get a free written quote 3–7 working days depending on size
— 01 / Why us

What you get every time.

  • —Fixed itemised quote with a clear timber allowance
  • —House never left open overnight
  • —Gutters, fascia and flashings replaced in the same job
  • —Skip, scaffold and disposal all included
— 02 / How the job runs
  1. 01

    Inspection & quote

    Roof and ceiling space inspected, photographed and priced line by line.

  2. 02

    Strip

    Old roofing removed in sections; frame exposed, inspected and repaired.

  3. 03

    Rebuild

    Sarking, battens, sheets, flashings, gutters and downpipes installed.

  4. 04

    Handover

    Final walkthrough, photo record and warranty paperwork.

Materials we specify
  • —Colorbond® steel in your choice of profile and colour
  • —Anticon® blanket or reflective sarking
  • —Treated pine or steel battens
  • —New Colorbond® gutters and downpipes
Warranty

10-year workmanship warranty in writing, on top of BlueScope's material warranty on Colorbond® steel (up to 36 years depending on grade and environment).

Licensed builder BLD 345605 · Fully insured

— 03 / Recent work

Real jobs, real roofs.

Full portfolio
Metal Roofing — Custom Sarah Homes, Gawler South Australia
Metal Roofing
Custom Sarah Homes
Gawler South Australia — 2024
Metal Roofing — New Re Roof, coomandook
Metal Roofing
New Re Roof
coomandook — 2026
Metal Roofing — Roof Repair, Tailem Bend
Metal Roofing
Roof Repair
Tailem Bend — 2026
— 04 / Questions

Asked often.

01

How long does a roof replacement take?

A typical three-bedroom home is three to five working days; larger or steeper roofs up to seven. Weather permitting — we don't open a roof with rain forecast.

02

Can I stay in the house during the work?

Yes. It's noisy during the day but the house stays weather-tight every night.

03

Do you handle council approval?

Most like-for-like replacements don't need it. Where heritage or character zoning applies, we check with council for you before quoting.

Free inspection & written quote

Talk to us about roof replacement.

Send the details through TradeHQ or call 0421 568 663 and speak to Jack directly.

Open enquiry form